Use cases

Start with the work that matters.

Proposed applications for pilot development with operators and technology partners.

01

Transport depots

Initial focus
Operational challenge
Checks on chargers, vehicles and depot equipment can be recorded in different places, which makes them hard to compare and follow up.
Proposed robotic task
Observations of selected accessible equipment and inspection points along a set route.
Intended benefit
A consistent record for each asset that maintenance can act on.
The pilot must validate
Depot traffic, access, the data available and the connection to the operator's systems.
02

Water infrastructure

Initial focus
Operational challenge
Pumping stations and utility facilities are spread out, and conditions can be hard to compare between visits.
Proposed robotic task
Inspection of suitable facilities or confined assets, depending on the platform and access.
Intended benefit
A comparable history of each installation.
The pilot must validate
Measurement conditions, access and a route the platform can follow safely.
03

Industrial operations

Initial focus
Operational challenge
Early signs of wear can be difficult to observe consistently between scheduled checks.
Proposed robotic task
Repeatable observations of selected equipment and operating areas.
Intended benefit
Findings that can be compared over time and followed through to maintenance.
The pilot must validate
Sensor suitability, background noise and a comparison with the current manual inspection.
04

Energy infrastructure

Initial focus
Operational challenge
Some equipment can only be observed from permitted positions, under specific procedures.
Proposed robotic task
Inspection of selected accessible assets with suitable sensors.
Intended benefit
Evidence a specialist can use to prioritise checks.
The pilot must validate
Load conditions, visibility, access and the site's safety procedures.
05

Solar operations

Further applications
Operational challenge
On large installations, locating potential issues and confirming what was done about them takes time.
Proposed robotic task
Observations that help locate and review potential issues.
Intended benefit
A clear link between the observation, the work done and the result.
The pilot must validate
How anomalies are confirmed, weather conditions and the configuration of the installation.
06

Internal logistics

Further applications
Operational challenge
Moving materials or checking areas within a site takes staff time and can be hard to trace.
Proposed robotic task
Selected material movement or inspection tasks, depending on site conditions.
Intended benefit
Traceable tasks with a clear handover.
The pilot must validate
Volumes, loading, handover, doors, lifts and shared spaces.

Another task

Have a different job in mind?

Describe the task and the site. We will tell you whether it fits a pilot and what has to be validated first.